KMI ACOUSTICS / TEST FACILITIES

EMC & RF TEST CHAMBERS

A chamber designed
around your test.

Shielded test environments with absorber systems, service interfaces and layouts selected for the intended measurement.

What to include in your brief
TEST VOLUMERF SHIELDSERVICE PANELABSORBER LININGCONCEPT ONLY · CONFIGURATION SUBJECT TO TEST REQUIREMENTS
RF chamber concept · Not an installed project image
Configured to applicationEMC / RF / antenna testing
Defined performanceShielding and absorber criteria
Integrated interfacesPower, RF and site services

DESIGN SCOPE

The test requirement
comes first.

EMC and RF measurements can require different chamber layouts and acceptance criteria. We establish the intended test before defining a configuration.

Shielded enclosure

Panel construction, RF doors, penetrations and shielding verification requirements.

Absorber system

Absorber type, frequency performance, layout and floor treatment.

Service integration

Power-line filters, RF connector panels, ventilation, lighting and grounding.

Installation & acceptance

Site access, usable volume, supply boundaries and agreed test methods.

TECHNICAL BRIEF

Send the parameters you already have.

An existing technical specification or tender document is a useful starting point. Missing items can be clarified during review.

ParameterInformation to provide
Test applicationTest type and applicable standards
Frequency & performanceActual test range, shielding and absorber requirements
Size & equipmentExternal or internal dimensions; DUT size and weight
Power & interfacesTotal equipment power, supply and connector requirements
Site & acceptanceInstallation location, access, schedule and test methods

QUESTIONS

Before a configuration is selected.

Is an RF chamber the same as an acoustic chamber?+

No. RF chambers control electromagnetic interference and reflections. Acoustic chambers control sound. The test application determines the required facility.

Does shielding effectiveness specify absorber performance?+

They are separate requirements. The shielding frequency range should not be used as a substitute for the required absorber performance or usable test range.

Can you work from an existing specification?+

Yes. Share the specification together with the intended test, available dimensions and service requirements. We will identify the details needed for a proposal.

START WITH YOUR PROJECT

Tell us about your project.

PROJECT ENQUIRY

Tell us what you are planning.

This enquiry is prepared in your browser. Review it, then send it with your email app. Technical documents can be attached to that email.

Your details are used to respond to your project enquiry. No information is sent until you send the email.